CONSTRUCTION OF 1000KVA SUBSTATION AT ENS FOAM

ens 1000kva

New construction of 1000kVA substation for ENS FOAM co.ltd in Tan Uyen, Binh Duong, Vietnam

Surveying the installation location of electric machines

At the beginning of each project, we had discussions with the investor to assess the electricity demand of the newly installed equipment. Assess the current status of the factory to calculate the volume of materials.

Select the transformer installation location and clearance around where the transformer is located.

Area where substation is located

Carrying out construction of unloading platforms for transformers, grounding piles, and power poles for overhead 22kV medium voltage lines.

 

Techniques for checking the location of transformers
Coordinate with relevant units to test transformers

 

 

 

 

 

 

 

 

 

 

Emoitech Engineering cooperates with EVN to check the substation location and conduct electrical testing for transformers.

After completing the test steps, make electrical connection from the medium voltage line of electricity

Construction and connection of 22kV line

Energize at the transformer high-voltage input FCO self-falling fuse.

Close the FCO at the substation

Using the dedicated phase order tester KYORITSU MODEL 8031  to determine the phase order at the main distribution board (MSB)

Check phase order at MSB cabinet

Completing the project of 1000kVA substation to upgrade capacity for the power system of ENS FOAM factory before the scheduled time.

With this project, Emoitech can proudly contribute to the safe and reliable power quality transmission to the plant.

Successfully energizing 1000kVA substation

THE SAFETY OF FACTORIES IS OUR MISSION